Performance of concrete bridge deck surface treatments final report by W. Spencer Guthrie

Cover of: Performance of concrete bridge deck surface treatments | W. Spencer Guthrie

Published by Utah Department of Transportation, Research Division in Salt Lake City, Utah .

Written in English

Read online

Subjects:

  • Bridges, Concrete -- Utah -- Floors.,
  • Bridges, Concrete -- Utah -- Testing.,
  • Bridges, Concrete -- Materials -- Utah.

Edition Notes

Book details

Statementprepared for Utah Department of Transportation Research and Development Division ; submitteb by Brigham Young University, Department of Civil and Environmental Engineering ; authored by W. Spencer Guthrie, Tyler Nelson, Loren A Ross.
SeriesUDOT research -- rept. no. UT-05.05
ContributionsNelsen, Tyler, 1976-, Ross, Loren A., Utah. Dept. of Transportation. Research Division.
Classifications
LC ClassificationsTG24.U8 G88 2005
The Physical Object
Paginationix leaves, 76 p. :
Number of Pages76
ID Numbers
Open LibraryOL18730097M
LC Control Number2006475439

Download Performance of concrete bridge deck surface treatments

Section – precast/prestressed concrete bridge members. section – post-tensioned prestressed concrete. section – bridge deck sealant. section – polymer modified concrete bridge deck. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS FP U.S.

Department of Transportation. Federal Highway. Sec Bridge Deck Concrete Wearing Surface Sec Low Slump Concrete Sec Latex Modified Concrete Sec Silica Fume Concrete Sec Latex Modified Very Early Strength Concrete Sec Concrete Overlays for Pavement Sec Bonded Concrete Overlays of Asphalt Pavements Sec Unbonded Concrete Overlays of Concrete.

Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges Adopted by the Texas Department of Transportation November 1, Version 1 – for November and December Letting. STANDARD SPECIFICATIONS FOR ROADS AND BRIDGES Connecting South Dakota and the Nation SOUTH DAKOTA DEPARTMENT OF TRANSPORTATIONFile Size: 3MB.

Oklahoma Department of Transportation Transportation Commission At-Large Chairman – Gene McKown, Norman Division 1 Member – Bob Coburn, Muskogee Division 2 Member – James Grimsley, Calera Division 3 Secretary – T.W.

Shannon, Oklahoma City Division 4 Member – Don Freymiller, Edmond Division 5 Member – David Dyson, Elk City Division 6 Member –. Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges Adopted by the Texas Department of Transportation November 1, “This edition of the West Virginia Division of Highways Standard Specifications, Roads and Bridges, has been issued with the intent Surface Treatments Overlaying of Portland Cement Concrete Bridge Decks Asbestos Abatement Painting Metal Structures.

SR (Load Testing of an FRP Bridge Deck on a Truss Bridge) SR (Strengthening of Church Street Bridge Pier Capbeam Using Bonded FRP Composite Plates Strengthening and Load Testing) SR (In-Service Evaluation of a Concrete Bridge FRP Strengthening System) SR (Temporary Rumble Strips) SR (In-Service Performance of an FRP.

bituminous treatments, surface courses and concrete pavement: prime and tack coats: hot mix asphalt - plant methods and equipment: milling of existing asphalt pavement: hot mix asphalt - general construction requirements: superpave asphalt concrete: asphalt concrete friction courses: value added asphalt.

Get this from a library. Improving pavement and bridge deck performance: proceedings of the Western Summer Meeting. [National Research Council (U.S.). Highway Research Board. Western Summer Meeting; National Research Council (U.S.).

Highway Research Board.; California. Division of Highways.] -- This issue of HRB Special Report contains the papers presented at. A 'read' is counted each time someone views a publication summary (such as the title, abstract, and list of authors), clicks on a figure, or views or downloads the full-text.

Portland Cement Concrete Payment 13 Safety Edge Surface Tolerance Method of Measurement DIVISION INCIDENTAL CONSTRUCTION Structural Concrete 15 Mixing Straightedge Testing of Hardened Bridge Decks Price Adjustments Prestressed Concrete Members 16File Size: KB. IDOT's Bureau of Design and Environment (BDE) issues the BDE Special Provisions four times a year.

They are inserted into contracts as they apply. To Performance of concrete bridge deck surface treatments book a file, click the link with the left mouse button.

To download a file: click the link with the. LTPP Data Analysis, Phase I: Validation of Guidelines for k-Value Selection and Concrete Pavement Performance Prediction: FHWA-RD Tire Pavement Noise and Safety Performance, PCC Surface Texture Technical Working Group: FHWA-SA Construction of Portland Cement Concrete Pavements - Particpant's Manual: These chemicals and water are harmful to the concrete and the steel reinforcing bars used in bridge structures.

The objective of this study was to develop a durable thin bonded overlay with chloride resistance to protect the reinforcing steel of the bridge deck. Overlays were developed and monitored after their initial placement on four : David A Meggers, Cliff Hobson.

In some areas of the country, the lifespan of a wooden deck is limited, no matter what you do. By starting over, you can get it right from the beginning. Upgrading to a high-quality deck substructure (here’s an example: Elevations steel deck framing from Trex) will help your new deck last a lifetime.

Book a Deck Contractor. The bridge deck, being exposed to both weather and vehicular traffic, is one of the more vulnerable compo-nents of the bridge system. An analysis of the Oklahoma Department of Transportation bridge inven-tory system indicates that there are 5, bridges with decks in fair or worse condition (Oberlender and Vonkarey ).

Prepackaged Ultra-High-Performance Concrete - Provide the material requirements for ultra-high-performance concrete. Jose Armenteros: DevUHPC Project List: N/A: Epoxy Overlay for Sealing and High Friction Surface Treatment on Concrete Bridge Decks - Provide and apply an epoxy as an overlay system over concrete bridge decks.

Chase Knight. Oklahoma Department of Transportation (Department) personnel, except where specifically provided for in these Specifications, will make inspections for the State to document that the Contractor is producing an acceptable product.

The Department will interpret these Specifications to allow the Contractor to controlFile Size: 3MB. However, this practice dilutes and washes away the surface mortar, resulting in poor performance of concrete pavement in terms of skid resistance, scaling, and durability.

If excessive mortar slurry is present during finishing operations (see Figure ) without the addition of water, this generally indicates an issue with the concrete mix. This project provided for a laboratory and field testing of several high performance repair materials for pavements and concrete bridge decks.

The main purpose was to provide ODOT with materials and procedures to shorten road and bridge closures. The project was relatively complex with several by: 1. Latex Modified Concrete Overlay for Bridge Deck Metal Structures Portions of Part III Technical Requirements of these Standard Specifications for Construction and Materials are written in the Active Voice writing style.

SECTION 3 ALASKA BRIDGE. A structure, including supports, erected over a depression or an obstruction, such as water, highway, or railway; and having a track or passageway for carrying traffic or other movingFile Size: 2MB.

Precast single span bridge girder (bridge design model) Two traffic bridge design models having one 45 m single span were analysed (see Almansour and Lounis, ). They consist of precast/prestressed girders and a cast-in-place deck slab. The deck slab is made of normal concrete in both cases.

Crack Bridging by Surface Treatments to Concrete. Pages Monitoring of Traffic Induced Strain in the Steel Reinforcement of a Concrete Bridge Deck. Pages Cairns, John. Bridge Management Book Subtitle Inspection, Maintenance, Assessment and.

R Guide for Concrete Highway Bridge Deck Construction Guide to Formwork for Concrete R Design Considerations for Environmental Engineering for Concrete R Use of Epoxy Compounds with Concrete R Accelerated Curing of Concrete at Atmospheric Pressure—State of the Art R Guide for Repair of Concrete Bridge SuperstructuresCited by: 2.

Section Asphalt Concrete Surface (Hot Mix) Pavement smoothness requirements, usually noted on plans (Typically resurfacing on State Routes) 2/11/19 A: Full Depth and Partial Depth Concrete Pavement Repair: See related item(s) 10/19/or C: Full Depth and Partial Depth Concrete Pavement Repair(High Early Strength).

Concrete or asphalt pavement under the guardrail would have to be constructed with a gap behind the post and backfilled with a loose material to allow the post to move when the rail is struck.

An asphalt spray surface treatment would be acceptable as it would not prevent post movement through the soil. The LTBP program is just beginning to collect non-destructive evaluation (NDE) field performance data on untreated concrete bridge decks (bare decks without asphalt overlays or other surface treatments to minimize the corrosion of reinforcing steel within the decks).

Nation AASHTO Sweet Sixteen Award, as one of the sixteen High Value Research Projects in the nation, for the Purdue-INDOT joint research project "Friction Surface Treatment Selection: Aggregate Properties, Surface Characteristics, Alternative Treatments, and Safety Effects".

SAMPLING AND TESTING. AND. BASIS FOR USE OF MATERIALS. GENERAL. The Department Standard Specifications, Sectionstates that the minimum required number of samples and tests will be as set out in the Frequency Manual.

This edition of the Frequency Manual was prepared to make the frequency of sampling and testing conform to theFile Size: KB. WSDOT Construction Manual M Page 3 October Foreword This manual is provided for our construction engineering personnel as instruction for fulfilling the objectives, procedures, and methods for construction administration of Washington State transportation projects.

This manual contains two kinds of. travels over a bridge. Bridge work items allowed include: a. Bridge asphalt overlay (only applies to bridges with an existing asphalt overlay) allowable work based on the pavement evaluation are as follows: 1.

Remove asphalt to deck and approach slab 2. Pothole patch concrete deck and approach slab 3. Install waterproofing membrane 4. Book of Standards - for Highway & Incidental Structures The Book of Standards is maintained by Maryland Department of Transportation State Highway Administration (MDOT SHA)'s Office of Highway Development to provide Engineering Personnel and Contractors with a complete and up-to-date catalog of Standards for Highways, Incidental Structures and Traffic Control.

concentrations measured mm (1/2 in.) from the bridge deck surface reached a stable condition after four to six years of service (Weyers et al. For this reason, the surfaceFile Size: 2MB.

The American Concrete Institute (ACI) is a leading authority and resource worldwide for the development and distribution of consensus-based standards, technical resources, educational programs, certification programs, and proven expertise for individuals and organizations involved in concrete design, construction, and materials, who share a commitment to pursuing the best.

Bridge deck construction using stay-in-place (SIP) fiber-reinforced polymer (FRP) structural forms has shown promise as an efficient, rapid, and low-waste alternative to conventional methods. Several studies have shown that the load capacity of this system is typically governed by punching shear strength, although no design-oriented equations.

ASTM's road and paving standards provide the specifications and test methods pertinent to the material, physical, mechanical, performance, and application requirements of road surfaces and pavements. These geotechnical surfaces are laid down on specified areas intended to sustain either or both foot and vehicular traffic.

Curing concrete bridge deck or RCBA: 05/21/ Bridge future wearing surface dead load: 05/21/ Use of english measurement units: Adv Pol: 05/14/ Impact attenuators: 02/07/ Concrete barrier railing:. The American Association of State Highway and Transportation Officials (AASHTO) Standard Bridge Specifications, the AASHTO Load and Resistance Factor Design (LRFD) Bridge Design Specifications, and the AASHTO LRFD Bridge Construction Specifications do not include guidance for soil-nailed structures.• Faulted Concrete Correction • Wheel Rut Removal • Temporary Driving Surface • Bridge Deck Repair • In-field Crushing of Material.

Micro Milling Advantages • Improves Ride on Overlays/Surface Treatments • Enhances Pavement Life Cycle • Reduction in Material Cost • Reduction in Construction CostFile Size: 6MB.The first defense against corrosion of steel in concrete is quality concrete and sufficient concrete cover over Steel corrosion on a bridge deck is not passive and rapid corrosion begins.

The rate of D., ed., Paul Klieger Symposium on Performance of Concrete, ACI SP,pp. 7.

42676 views Friday, December 4, 2020